Food Manufacturer Reverse Osmosis Failure

It’s December 30th (A Friday @ 3:00 PM) And Our Phone Rings – A customer is having a problem keeping the conductivity within spec for production.

They need to be running by Jan 1st because that’s when production starts up. Their current service provider has been having trouble trying to diagnose the problem.

They need help and need their system running Now – Complete Water was onsite by 7:00 PM with NSF 61 Approved Chemistry to clean the RO System.

Silica and scale were the cause for the increase conductivity. After further investigation we found the pre-treatment equipment was having problems which lead to the spike in RO Conductivity.

Even though Complete Water Solutions did not provide the equipment originally, we can service all competitors equipment.

reverse osmosis repair, industrial ro repair, industrial reverse osmosis service
Food Manufacturer Reverse Osmosis Failure and Repair
reverse osmosis service, reverse osmosis repair, industrial ro repair
Controller
manufacturer reverse osmosis repair, reverse osmosis system, reverse osmosis service
RO Equipment
reverse osmosis repair, industrial ro repair, reverse osmosis manufacturer equipment repair
Food Manufacturer Reverse Osmosis Repair